But what about the heat introduced for the duration of clinker cooling or the drying processes? Sector reviews estimate that just about forty% of all Power inputs in cement manufacturing are wasted via heat loss, generally by outdated cooling units and inadequately insulated kilns. NREL’s campus heating drinking water process, https://purethermal.co.uk/media-news/november-launch-waste-heat-recycling-design-support-service-from-pure-thermal-and-oilon/